Inserted projects are calculated like summary tasks
Bu dilde resmi metin yok (İngilizce özgün metin gösteriliyor)
- İlke Kimliği
- L_PjInsertedProjects
- Kapsam
- Kullanıcı Yapılandırması
- Desteklenen işletim sistemleri
- En az Windows Server 2008 R2 veya Windows 7
- Kaynak
- Microsoft 365 Apps / Office Administrative Templates (sürüm 5568.1000)
- Kategori
- Microsoft Project 2016 › Project Options › Calculation › Calculation options for 'Project1'
Açıklama
Specifies that a single critical path is calculated throughout the master project, by treating inserted projects as summary tasks in the master project.
If you enable this setting, the critical path is calculated by treating inserted projects as summary tasks.
If you disable or do not configure this setting, the user's default setting is used.
Kayıt defteri
KullanıcıHKEY_CURRENT_USER
HKCU\software\policies\microsoft\office\16.0\ms project\options\calculation Kayıt defteri değerlerini gör
- inserted projects are calculated like summary tasksREG_DWORD