Edits to total task % complete will be spread to the status date
Bu dilde resmi metin yok (İngilizce özgün metin gösteriliyor)
- İlke Kimliği
- L_PjEditstoTotalTask
- Kapsam
- Kullanıcı Yapılandırması
- Desteklenen işletim sistemleri
- En az Windows Server 2008 R2 veya Windows 7
- Kaynak
- Microsoft 365 Apps / Office Administrative Templates (sürüm 5568.1000)
- Kategori
- Microsoft Project 2016 › Project Options › Calculation › Calculation options for 'Project1'
Açıklama
Distributes the changes to total percent complete evenly across the schedule to the project status date (or to the current date if you haven't specified a project status date).
If you enable this setting, edits to total task percent complete are evenly distributed across the schedule up to the status date.
If you disable or do not configure this setting, the user's default setting is used.
Kayıt defteri
KullanıcıHKEY_CURRENT_USER
HKCU\software\policies\microsoft\office\16.0\ms project\options\calculation Kayıt defteri değerlerini gör
- edits to total task %complete will be spread to the status dateREG_DWORD